The project site is situated in the southern sector of the Triel-sur-Seine municipality, straddling the northern border of the Carrières-sous-Poissy municipality. It is directly connected to the proposed Peuple de l’herbe park to the south and the proposed ZAC Ecopôle integrated development zone to the west.
The preliminary design studies for the Ecoport project were presented in December 2013
The main progress points concerned the detailed descriptions of the various port facilities and the platform itself (excavation and reinforcement of the banks and level areas, river facilities for loading and unloading, water development and ecological engineering projects, etc.). Alongside these “technical” studies, certain sectors that were as yet unmapped had to be defined more […]